• Flow Science analyzed the operation of the the City’s largest wastewater pump station.
  • Flow Science determined optimal operating conditions.
  • Flow Science designed flow elements to prevent spilling and minimize transients in this complex wastewater outfall system.

Crosstown Tunnel and Southwest Ocean Outfall Hydraulic Analysis

City and County of San Francisco Wastewater Department
San Francisco, CA


  

 

 

 

Flow Science analyzed the operation of the the City’s largest wastewater pump station, the proposed 12-ft Crosstown tunnel, and the Southwest Ocean Outfall serving the City of San Francisco.

Flow Science computed hydraulic profiles and determined optimal operating conditions and helped design flow elements to prevent spilling and minimize transients in this complex wastewater outfall system